Find the right building switchboard for your needs
Before you as a developer break ground, the power source must be under control. The main panel with CEE outlets is the focal point for all live cables and all electrically powered machines you need during the construction phase.
It supplies any subboards that may be on the respective floors. If the topping-out ceremony is far in the future, a sturdy board stand will be preferable. Then the power is always available despite harsh weather and working environment. A tripod with carrying handles can be useful, other times a fixed location is best.
No matter how extensive a construction project you are in charge of and how powerful the power supply is needed for your appliances, we can supply compact mini panels as well as construction site panels that can draw 16, 32 or 63 amps per outlet. If you need a professional 250a meter board, we can handle that too.
When we talk about power take-offs, consider how many craftsmen enter the site with their own power tools. It can be difficult to get skilled people - do not risk wasting time because you have bought a board with just 4 CEE outlets, when in reality you need 6, 8 or 10. Safety is not compromised by connecting several efficient power tools – the panels have HPFI relays and the necessary fuses.
Before new construction or conversion takes shape, billing of power consumption must be considered. As this is a temporary installation, it is not a given that the local power plant will set up metering at the place where the construction site panel is to be connected to the grid. We offer various construction site panels with meters from, among others, ELOGIC SYSTEMS.
There are several ways to do this – you can get models with an approved electricity meter built in – these are often at the more expensive end of the price spectrum. Conversely, you are always on the safe side, as you can read directly, but please check with your electrician. We sell versions that are prepared for wire measurement and prongs. You will also find models with meter trafo.
Building switchboard – 16a, 32a or 63a?
The space boards are available in mobile and more stationary size. They deliver different numbers of amperes. Determine the need by looking at which machines your craftsman will use at the same time, and whether there should be both 230 V and 400V CEE connection for everything from impact drill to workplace lighting.
Regardless of the maximum limit, the panel runs on strong current, so it is better to consult the electrician and utility company once too much than too little, so that there is the necessary electricity capacity for the crew.
Efficient and safe power supply with construction power boards
We wish our business customers the best and offer a complete range of building power centers with DK ground connectors and which meet European standards according to DS/EN 61439-4 (formerly DS/EN 60439-4:2007).
Construction occurs at all times of the year. The materials are durable and carefully selected for construction and systems such as hot-dip galvanized steel, aluzinc sheet and UV-resistant and impact-resistant thermoplastics. Please note that in the case of a new temporary installation, the owner or user is responsible for errors and omissions.
You can read more about ACS panels, overcurrent protection, RCD and selectivity on the Danish Safety Authority's website. Here you can also learn more about the choice of cable bridge for securing e.g. extension cords and cable drums.